May 2026 Snapshot: Where the Project Stands
By May 2026, RCC structural work was progressing across multiple residential towers, with some towers having reached advanced floor levels while others were still working through mid-rise construction. Concrete casting was active on the upper floors, and column, beam, and slab work continued as the core structural activity for the month.
Based on the visual progress reviewed, structural work overall was estimated at roughly 80-90% complete — meaning the bulk of the RCC framework is up, though a few towers still have floors left to cast before the structure is fully topped out.